ATLAS Upgrade: tests of strip modules
Usefull Webpages:
https://twiki.cern.ch/twiki/bin/view/Atlas/SCTUpDAQConfig
https://twiki.cern.ch/twiki/bin/view/Atlas/StripsUpgradeDAQ#Software_installation
Single Hybrid Tests on Panel
Module Tests (with test frame)
In st_system_config need config files for each of the two hybrids like:
|
stream ID |
|
|
|
|
|
|
|
|
|
|
|
|
|
link ID |
delay |
hybrid name |
|
Module |
0 |
1 |
|
1 |
-1 |
-1 |
-1 |
0 |
0 |
0 |
1 |
1 |
0 |
3 |
0 |
1 |
0 |
50 |
50 |
ABC130_Panel_D_Hybrid5_HCC8 |
ABC130_Test |
Module |
1 |
1 |
|
1 |
-1 |
-1 |
-1 |
0 |
0 |
0 |
1 |
1 |
0 |
3 |
0 |
3 |
2 |
50 |
50 |
ABC130_Panel_D_Hybrid2_HCC11 |
ABC130_Test |
the 'stream ID' (first 2 numbers) defines the output stram position in the GUI window
the 'link ID' defines the physical position of the data lines on the connector for the hybrids. Here the left hand hybrid has the ID 3 2 and the right hand hybrid has the ID 1 0
the 'delay' can vary for different systems
for each hybrid a separate config file has to exist with the proper name.
Without Power Board
Hybrid power should be set to ~1.59V with a max current limit of 3 A
- before configuration the current is approximately:
- after configuration the current is approximately: 2 A
With Power Board
Hybrid power should be set to ~10.12V with a max current limit of 4 A
- before configuration the current is approximately: 0.3 A
- after configuration the current is approximately: 0.41 A
-- %USERSIG{swonsak - 2017-02-27}%