ABC130 / HCC Panel Metrology



ABC130/HCC V1.0

(May 2016)

Panel Metrology

ZOT/Stevenage panels with + shaped fiducials

The measurement program for the smartscope requires very few user interactions at the begin:

In the document below the program steps are discussed. It also includes tips to measure the etch quality.

To analyse the output file the attached excel spreadsheet can be used:

The expected positions of the fiducials have been calculated, based on the coordinates from the panel design file. The used values can be seen in the 'Expected Values' sheet of the analysis file. All calculated numbers are based on the numbers with a yellow background and whenever possible these cells are referenced. The sheet '!ExpectedData' shows the expected values again in the same format as the output file, to allow easy comparisons.

To analyse a new measurement the following steps are required:
  • open the analysis spreadsheet with excell
  • open the output file with excel
    • it is important to choose the right options when importing the csv file so that all columns are separated
  • cope the measurement results
  • go to the 'Measurement' sheet in the analysis file
  • paste the measurement values by clicking on the top left cell (A1);
    • right click to open the special paste options
    • choose 'Values' (this will only paste the numbers, but keep the format of the spreadsheet, including the colours)
  • go to the 'Summary' sheet to see all the plots

In the 'Measurement' sheet the cells which contain the comments as well as the step numbers and the step title are in green because they have no influence on the analysis. The red cells are used for numbers that are not important or are not used. For example the Z coordinates from points is not used because the height measurements are done separately. All numbers with a white background are important and used for the analysis.

Flex height

To measure the height of the flex with respect to the FR4 a new program is used, which utilized the touch probe. Measured are the landing pads, the FR4 close to the hybrid caps and the ASIC pads. For each hybrid the FR4 plane is created and set as 0, then the other points are written to file. This allows to check the flatness of a hybrid with respect to the FR4 carrier and also look at the landing pad heights.

Comments:

Height difference between Panel landing pads and ASIC pads caused by adhesive (bondply) that connects laminate to FR4 (frame) but is not under the hybrid

approximately 50um height difference -> seen with smartscope

Zot Panels (May 2016)

Stevenage Panels (June 2016)

Zot & Stevenage after SMD population (July 2016)

Most of the 0201 capacitors (data lines...) are missing (expected by Norcott due to very small size of components).

All Stevenage hybrids lifted from panel (large bow without vacuum), Zot panels are fine.

RP1 and RP2 wrong orientation (and some are missing)

Below is a detailed list of the missing/failed SMD components, and it can be seen in the attached file as well.

List with current status of panels and hybrids

  • swapped hybrid 4 from Panel I with hybrid 4 from Panel III

Panel Hybrid C5 C7-C12 other Comment
RP1 and RP2 wrong orientation on all panels (some missing)

Stevenage I

Liverpool;RAL

delamination; RFIDPN shifted
0 n/a     ASIC populated, tested OK
1 n/a     ASIC populated, tested OK
2 n/a     ASIC populated, tested OK
3 n/a     ASIC populated, tested OK
4 n/a     ASIC populated, tested OK (from Panel III)
5 n/a     ASIC populated, tested OK
6 n/a     ASIC populated, tested OK
7 n/a     ASIC populated, tested OK
 

Stevenage II

used

very little delamination
0 n/a n/a RFID, NTC2 tombstone, C3, R1  
1 n/a n/a RFID, C2, C3, C4, C6  
2 n/a n/a RFID, C1, C3, C4  
3 n/a n/a RFID, C1, C2, C3, C4, R2, CR5 shifted  
4 n/a n/a RFID, C2, C3, C4, C6, NTC2, CP6 shifted  
5 n/a n/a RFID, C1, C2, C3, R1  
6 n/a n/a RFID, C1, C3, C4, C6, NTC2  
7 n/a n/a RFID, C3, C4, R1  
 

Stevenage III

Liverpool

 
0       after cleaning 0201 capacitor+pads broken
1 n/a     ASICs populated, tested OK; used for module (04/09/2016)
2       ASICs populated first test not working
3       after cleaning 0201 capacitor+pads broken
4 n/a     ASIC populated, tested failed (no ABC ID); from Panel I
5 n/a     ASICs populated Test failed (no HCC address)
6 n/a n/a    
7   n/a    
 

Stevenage IV

US

small delamination
0 n/a n/a    
1 n/a n/a    
2 n/a n/a C3, C4, R1  
3 n/a n/a C3, C4, CP6  
4 n/a n/a C3, C4, C6, R1  
5 n/a n/a C3, C4, C6  
6 n/a n/a C3, C4  
7 n/a n/a C3  
 

Stevenage V

US

some delamination
0   C8, C10, C12 NTC2 tombstone  
1 n/a C8-C12 NTC2 tombstone  
2 n/a n/a R1  
3 n/a n/a R1  
4 n/a n/a R1, C4  
5 n/a n/a C3, C4  
6 n/a n/a    
7 n/a n/a    
 

Stevenage VI

used

very small delamination
0 n/a C7, C8, C9, C11, C12 NTC2 tombstone  
1 n/a n/a NTC2 tombstone, NTC1, C1, C3  
2 n/a n/a C3, C4, C6, CP10  
3 n/a n/a C3, C6, CP10, RFID  
4 n/a n/a C3, C4, C6, R1  
5 n/a n/a C3, C4, RFID shifted  
6 n/a n/a C3, C4, R1  
7 n/a n/a    
 

Stevenage VII

RAL

hybrid 2 & 5 one tab brocken [bottom]
0        
1 n/a      
2 n/a      
3 n/a      
4 n/a      
5 n/a      
6 n/a      
7   C11, C12 RP2 OK 0201 capacitor pad brocken
 

Stevenage VIII

used

very little delamination
0 n/a n/a NTC2 tombstone, C3, R1  
1 n/a n/a C3, C4, CP11  
2 n/a n/a C1, C2, C3, C4, C6 failed electrical circuit; used at Birmingham
3 n/a n/a C1, C4, C6 failed electrical circuit
4 n/a n/a R1, R2, C1, C3, C4, C6, CP1 shifted, CP11  
5 n/a n/a C1, C3, C4, C6  
6 n/a n/a    
7 n/a n/a    
 

Stevenage IX

RAL

right Test Coupon; very little delamination; left test coupon removed
0     RFID  
1 n/a   NTC2 tombstone  
2        
3 n/a      
4       failed electrical circuit
5        
6       failed electrical circuit
7       used for Liverpool module (08/09/2016)
 

Stevenage X

US

 
0        
1       failed electrical circuit
2       failed electrical circuit
3 n/a C8, C9, C10, C12    
4 n/a n/a    
5 n/a n/a C3  
6 n/a n/a C3, C4, R1  
7 n/a n/a    
 

ZOT A

used

RFIDPN, RFIDTC (both), some delamination
0 n/a   RFID  
1 n/a   RFID  
2 n/a   RFID  
3 n/a C7, C8, C9, C10, C12 RFID, CP11 (1 add. SMD)  
4 n/a n/a RFID  
5 n/a   RFID  
6     RFID  
7 n/a   RFID  
 

ZOT B

available

 
0 n/a C8, C10, C12 NTC2 tombstone  
1 n/a n/a NTC2 tombstone  
2 n/a n/a R1  
3 n/a n/a R1  
4 n/a n/a R1  
5 n/a n/a    
6 n/a n/a    
7 n/a C11    
 

ZOT C

used

 
0 n/a n/a NTC2 tombstone  
1 n/a n/a C3  
2 n/a n/a C3, C4, R2, RFID  
3 n/a n/a C2, C3, C4, C6, R2, RFID  
4 n/a n/a C3, C4, R1, R2  
5 n/a n/a C1, C3, C4, C6, NTC2  
6 n/a n/a C3, C4  
7 n/a n/a C3, C4, R1  
 

ZOT D

used

Liverpool

some delamination (at landing pads of hybrid 1, 3 [top])
0       ASIC populated, tested OK, Module W668
1 n/a     ASIC populated, tested OK, Module W683
2 n/a     ASIC populated, tested OK, Module W680
3 n/a     ASIC populated, tested OK, Module W682
4 n/a     ASIC populated, tested OK, Module W682
5 n/a     ASIC populated, tested OK, Module W680
6 n/a     ASIC populated, tested OK, Module W683
7 n/a     ASIC populated, tested OK, Module W668



-- SvenWonsak - 17 May 2016
Topic attachments
I Attachment Action Size Date Who Comment
ABC130-HCC-Panel-V1.mximxi ABC130-HCC-Panel-V1.mxi manage 2 MB 18 May 2016 - 13:02 SvenWonsak Smartscope measurement program
ABC130HCC-fullPanel_Touch.mximxi ABC130HCC-fullPanel_Touch.mxi manage 839 K 29 Jul 2016 - 14:49 SvenWonsak Height measurement of full panel
Dimensions-Analysis-Master.xlsxxlsx Dimensions-Analysis-Master.xlsx manage 185 K 11 Jul 2016 - 13:20 SvenWonsak Excell spreadsheet for analysis
SMD-components_V2.pdfpdf SMD-components_V2.pdf manage 1 MB 01 Dec 2016 - 17:00 SvenWonsak SMD component list
Smartscope-ABC130-HCC.pdfpdf Smartscope-ABC130-HCC.pdf manage 2 MB 23 Jun 2016 - 09:02 SvenWonsak Measurement Program description
Total-Summary-Stevenage-June2016.xlsxxlsx Total-Summary-Stevenage-June2016.xlsx manage 1 MB 11 Jul 2016 - 13:20 SvenWonsak Summary of all Stevenage Panel measurements
Total-Summary-Zot-May2016.xlsxxlsx Total-Summary-Zot-May2016.xlsx manage 640 K 11 Jul 2016 - 13:20 SvenWonsak Summary of all Zot Panel measurements
VisualInspection_19-07-16.xlsxxlsx VisualInspection_19-07-16.xlsx manage 18 K 20 Jul 2016 - 10:34 SvenWonsak List of failed components after SMD population
ZOT_HybridPanel.pdfpdf ZOT_HybridPanel.pdf manage 759 K 18 May 2016 - 13:01 SvenWonsak Panel top layer
Topic revision: r22 - 21 Mar 2018, SvenWonsak
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback