Forward Tracker Upgrade Home Page

The H1 Forward Tracker

The Group

0 Forward Tracker Upgrade Group

Safety

0 Safety intructions

0 Emergency exits, H1 Hall

Public Documents

0 Proposal for PPESP

0 Further comments for PPESP

0 Proposal for PRC

Manuals

0 Planar test manual for those on shift at Daresbury.

Meetings

0 Agendas and minutes, construction

0 Agendas etc, commissioning

Installation at DESY

0 Test pulse data

0 Old planar cable data

0 New planar cable data

0 H1 Upgrade schedule

0 Required infrastructure

0 DESY FTD upgrade schedule

0 DESY upgrade manpower requirements (dates have now changed!)

Work on Software and Alignment

0 FT Upgrade Software home page

0 John's index

0 Rob's H1 upgrade page

0 Rob's pattern recognition page

0 Rob's alignment page

0 Girish's index

0 ToDo list

Schedules/Task lists

0 Overview of accelerator shutdown work 2000

0 DESY accelerator schedule 2000

0 HERA schedule 2000 until 2002

0 Overall FT upgrade schedule

0 Planar construction schedule

0 Planar test schedule

0 Planar installation schedule

0 FTD DESY installation schedule

0 Chamber construction manpower requirements (dates have now changed!)

0 DESY upgrade manpower requirements (dates have now changed!)

0 ``Deliverables''

0 Task list

Miscellaneous

0 Index to some notes

0 Some pictures

0 Pictures of installation at DESY

0 Complete set of technical drawings

0 Some transparencies

Hardware

0 Breakdown of construction tasks