Forward Tracker Upgrade Home Page
The Group
Forward Tracker Upgrade Group
Safety
Safety intructions
Emergency exits, H1 Hall
Public Documents
Proposal for PPESP
Further comments for PPESP
Proposal for PRC
Manuals
Planar test manual for those on shift at Daresbury.
Meetings
Agendas and minutes, construction
Agendas etc,
commissioning
Installation at DESY
Test pulse data
Old planar cable data
New planar cable data
H1 Upgrade schedule
Required infrastructure
DESY FTD upgrade schedule
DESY upgrade manpower
requirements (dates have now changed!)
Work on Software and Alignment
FT Upgrade Software home page
John's index
Rob's H1 upgrade page
Rob's pattern recognition page
Rob's alignment
page
Girish's index
ToDo list
Schedules/Task lists
Overview of accelerator shutdown work 2000
DESY
accelerator schedule 2000
HERA
schedule 2000 until 2002
Overall FT upgrade schedule
Planar construction schedule
Planar test schedule
Planar installation schedule
FTD DESY installation schedule
Chamber construction manpower
requirements (dates have now changed!)
DESY upgrade manpower
requirements (dates have now changed!)
``Deliverables''
Task list
Miscellaneous
Index to some notes
Some pictures
Pictures of installation at DESY
Complete set of technical drawings
Some transparencies
Hardware
Breakdown of construction tasks