FTD Upgrade Infrastructure Requirements ======================================= Overall working area supplied by DESY ------------------------------------- Floor area 15m x 15m. Working height below cranes 6m. Load capacity of cranes 2 Tonnes. Clean room facilities --------------------- DESY clean room, 6 power outlets. Clean tent (supplied by UK) 6.1m x 9.15m x 3.66m, lighting and 6 power outlets supplied by DESY. Storage requirements -------------------- Three inspection tables (1.8m x 1.8m x 0.8m) for construction of supermodules supplied by UK. Storage racks to accommodate up to 14 planar chambers, supplied by UK. Clean room benches with drawers (4, 1.5m long) supplied by DESY. Flat bed trolley, supplied by DESY. Tools, jigs and fixtures (all supplied by UK) --------------------------------------------- Wiring table, wiring jig and tensioning jig. Crimp tools and wire. General tools. Soldering iron and accessories. Crate of accessories (see Don Clarke). Twenty power outlet adaptors. Testing apparatus (all supplied by UK) -------------------------------------- Gas box and associated items (gas supplied by DESY). DAQ equipment. Tensioning test boxes and magnets. Clean room clothing (all supplied by UK) ---------------------------------------- Moving frames (supplied by DESY) -------------------------------- Yellow transportation frame. Green transportation frame. Aluminium cable support frame. Rotating mechanism (needs repair).