Agenda of LCFI group meeting, Thursday 24th June, 4 pm UK time. You can participate in this meeting in one of three ways. You may come to RAL (Conf Room 1, Building R1), to Liverpool U Physics Dept, Oliver Lodge Laboratory, Room 306, or you may phone in from wherever you are. Phone-in participants should ring the BT conference centre at +44 1296 333400 (or 01296 333400 from the UK). This will connect you to an operator. Ask for the RUTHERFORD CONFERENCE CHAIRED BY MR GILLMAN, ACCESS CODE C4916. (I will be phoning in from SLAC. Those participating from SLAC are invited to come to my office, where we will have a speaker-phone.) Meeting Agenda 1) Action items from last meeting will all be best covered in the progress reports (Item 2). But would everyone concerned please check the notes of the May 27th meeting and review the status of your action items. 2) Detector R&D status reports RAL Lab 9 prep, and RAL/Oxford portable cryo system Bob E Cryostats, test boxes and heaters Andy N Detector mechanical design concept Andy N/Chris D Lab 6 cleanroom and thin ladder assembly/test programme Laurie L Liaison with and hardware from EEV Chris D CCD mbds, flex-lines, drive modules Steve Bu Analogue modules Roger B ADC and digital modules Tony G VME crates, computers and software David S L'pool Cryo system and cryostat Tim G ISE simulation facilities (CCD and ladder design) Steve Bi Oxford WIPM system developments Phil B 3) LCFI organisation/budget/manpower Chris D 4) Detector simulations and physics Phil B et al (particularly, any input for CERN meeting) 5) Outcome of CD-1 Review of NLC, and subsequent developments 6) Future meetings (updated): ECFA/DESY Mtg 5-6 July 1999 (CERN) Plans for how to converge on detector design. ECFA/DESY Workshop 16-19 October 1999 (Strasbourg) Physics and detector developments ECFA/DESY Workshop March/April 2000 (Naples/Milan/...???) Responsibilities for writing TDR. ECFA/DESY Workshop October 2000 (DESY) Discussion of first draft of TDR. The final version of the TESLA TDR will be due in Spring 2001. The timescale for JLC will be similar, and the North American TDR will be completed a year later. 7) Further moves towards internationalization, possibly via ICFA 8) AOB If you have transparencies or drawings to show, you should send them electronically to Tim Greenshaw, green@hep.ph.liv.ac.uk, so he can make them accessible from the LCFI home page.