LCFI group meeting on Thursday 20th September ============================================= Start: 16:00 UK time. You can participate in this meeting in one of three ways. You may come to RAL (Conf Room 1, Building R1), to Liverpool U Physics Dept, Oliver Lodge Laboratory, Room 306, or you may phone in from wherever you are. Phone-in participants should ring the BT conference centre at +44 1296 333400 (or 01296 333400 from the UK). This will connect you to an operator. Ask for the RUTHERFORD CONFERENCE CHAIRED BY MR DAMERELL, ACCESS CODE C603571. Meeting Agenda ******************** NOTE: Item 6 is the most pressing, and I suggest we start the meeting with this. ******************** 1) Detector R&D status reports RAL Thin ladder development programme Erik J, Laurie L Drive control module Edward S et al ADC system (from ESD group) Dave S, Tony G Detector testing Konstantin S, Bob E et al Col parallel CCDs (work with Marconi) Chris D et al Col parallel CCDs (simulation) Konstantin S Readout chip (col parallel) Steve T et al Bump bonding Chris D et al Driver and motherboards Tony G et al NB. I have removed 'online system', 'test system cryogenics', 'ADC (commercial)' and 'sequencer' from the list, since Konstantin and Bob have got these fully working. Very major achievements! They will report any further refinements in these areas under the topic 'detector testing'. L'pool Cryo system and cryostat Tim G Device simulation Tim G et al Oxford WHIPM system developments Phil B, Glenn C Ladder R&D (mechanical) Wing Lau, Phil B 2) LCFI Finances Dave S 3) LCFI organisation/manpower Each group rep 4) Ongoing detector simulations/physics studies Stefania X, Matthew W 5) Forthcoming conferences ECFA/DESY 3rd series (Krakow) 15th-18th September Vertex 2001 (Brunnen) 24th-28th September 6) Proposal to Technology Fund and status report to PPRP (Projects Peer Review Panel, formerly PPESP) The proposal to the Technology fund was submitted by the deadline of 10th September. There are a few items we need to discuss about this bid. I hope to distribute the draft status report to the PPRP by the morning of 20th September. It can't be sooner, because of my responsibilities at the ECFA/DESY workshop. I am sorry about the tight schedule, but I hope everyone will have time to read it, so we can agree on the final version during our phone conference. Even so, we will miss Dave Morrell's requested submission date of 15th September. 7) AOB If you have transparencies or drawings to show, please send them electronically to Tim Greenshaw, green@hep.ph.liv.ac.uk, so he can make them accessible from the LCFI home page.