LCFI group meeting on Thursday 24th February ============================================ Start 2 pm at Rutherford Appleton Lab in Conference Room 1, Build. R1. Everyone who can attend is invited to meet in Chris Damerell's office at 1 pm so we can have lunch together and see the developments in the RAL facilities. If you arrive late, you will find us in the cafeteria. Meeting Agenda 1) Report from ECFA/DESY meetings in CERN on 8&9/2/00 Chris D 2) Action items from last meeting will all be best covered in the progress reports (Item 3). But would everyone concerned please check the notes of the last meeting and review the status of your action items. 3) Detector R&D status reports RAL Thin ladder assembly/test programme Erik J/Laurie L Ladder survey system Erik J/Laurie L Status of detector test cryostat Andy N Detector test system; Lab 9 preparations Bob E/Erik J CCD mbds, flex-lines Steve Bu Drive modules Edward S Analogue modules Roger B ADC and digital modules Tony G VME system, computers and software David S Liaison with and hardware from MAT Chris D L'pool Cryo system and cryostat Tim G ISE & Maxwell simulations (CCD/ladder design) Steve Bi/Dave M Oxford WHIPM system developments Phil B/Glenn C 4) LCFI Finances Dave S 5) LCFI organisation/manpower Each group rep 6) Detector simulations and physics Each group rep 7) Future meetings 8) AOB If you have transparencies or drawings to show, please send them electronically to Tim Greenshaw, green@hep.ph.liv.ac.uk, so he can make them accessible from the LCFI home page.