Notes on test meeting, Daresbury, 5/7/99 ======================================== Present Tim Greenshaw, Derrick Hill, Graham Houghton, Gary Markey, Dave Sankey and Terry Sloan. Apparatus needed for tests -------------------------- Cables needed for trigger, all 30m: 4 signal cables (BNC). 4 HT cables (SHV). Cables needed for chamber HV, total length 30 m: 16 SHV to SHV (length needed probably about 22 m). 16 SHV to ``special'' lemo cables (length about 8 m). Cables needed for chamber readout, length 30 m: 8 CELLO cables (one spare per test station). Now installed. Sundries: 4 flying lead connections between feedthrough and cell, length about 1.5 m. 8 pre-amps cards 1 j0 board (to take signals into FADC) 1 ADC card Analogue 'scope Front panel extender card Detailed test programme Radioactive source Excel Planar version of readout software Ethernet cable CAEN crate 3 Feedthroughs The following people will arrange the listed items: Derrick ------- Analogue 'scope. Flying leads. HV cables for trigger and chambers CAEN crate Feedthroughs Tim --- Front panel extender card Test programme (discuss with Don) Radioactive source Dave ---- Excel VME Init Planar version of readout software Ethernet cable ADC card j0 board Next meeting, 20/7/99 at Daresbury.