Minutes of the Liverpool pixel meeting on 30 Oct 2012. Present: Dean, Ilya, Paul, Phil, Sergey. Dean and Paul are populating the Pixel twiki with list of devices, etc. We need to know what wafers were used for the assemblies to add the IV curves. Sergey installed the testbeam reconstruction software and need access to the testbeam data. It would be interesting to look at the data for the assembly 13. The assemblies from Glasgow will be sent for coating and then to Liverpool. We will need to send the modules we have for coating as well. It would be good to measure some modules before we send them. Dean is tuning the readout of MSS01 module. It should be done by the middle of the next week. Then he will do the source measurements with this module. After that one of the VTT modules could be measured (assembly 13?). Ilya will start debugging and fixing the PCBs (distracted by Clatterbridge) and designing the PCB for our readout. Phil suggested to ask Craig to buy 3 more USBPix systems to develop simultaneous readout of 4 FE-I4 chip objects. Dean mentioned that we need KEL cables and PC boxes for them.