minutes of Liverpool Pixel group meeting 7/1/2014 Present: S.Burdin, G.Casse, P.Dervan. We need to prepare better for the Testbeam in February. 1. Marko will look at the design of cooling for the testbeam. 2. All the devices should be tested in Liverpool first. a) Shipping of the devices from DESY (Marko) b) The devices should be repaired c) Paul plays with the RCE system this week (also testing the cosmic card) and the next week Gian and Sergey learn from Paul and Marko how to work with the RCE system. d) Dry air line should be extended to the RCE stand (Mike) e) After the devices are repaired we make the list of measurements