Tevatron Operations
•
Commissioning Run
•
7 fills: Oct 8
th
– Nov 4
th
•
Max lumi: 4x10
29
cm
-2
/s
with 36x36 bunches
•
57.6nb
-1
integ. lumi.
•
All detectors installed bar
Silicon.
6% proto-type
instead.
•
Level 1,2 & 3 triggers
•
Full DAQ
•
•
Run II
•
April 3
rd
2001
0
LHC
startup
•
Max lumi: 7.9x10
30
cm
-2
/s
•
7.2pb
-1
integ. lumi.
•
Expect 2000pb
-1
•
CDF essentially complete
•
Level 1 (2) 3 triggers
•
Physics quality data