Tevatron Operations
•Commissioning Run
•7 fills: Oct 8th – Nov 4th 
•Max lumi: 4x1029cm-2/s with 36x36 bunches
•57.6nb-1 integ. lumi.
•All detectors installed bar Silicon.  6% proto-type instead.
•Level 1,2 & 3 triggers
•Full DAQ
•
•Run II
•April 3rd 2001 0 LHC startup
•Max lumi: 7.9x1030cm-2/s
•7.2pb-1 integ. lumi.
•Expect 2000pb-1 
•CDF essentially complete
•Level 1 (2) 3 triggers
•Physics quality data