Meeting of the LCFI group meeting on Thursday 20th December =========================================================== Start at 16:00 UK time. You can participate in this meeting in one of three ways. You may come to RAL (Conf Room 1, Building R1), to Liverpool U Physics Dept, Oliver Lodge Laboratory, Room 306, or you may phone in from wherever you are. Phone-in participants should ring the BT conference centre at +44 1296 317500 (or 01296 317500 from the UK). This will connect you to an operator. Ask for the RUTHERFORD CONFERENCE CHAIRED BY MR DAMERELL, ACCESS CODE C571474. Meeting Agenda 1) UK PP funding crisis; consequences for LCFI I, along with all UK experiment spokespersons, have received a request from SCP4 (the Science Committee Particle Physics Planning Panel), asking our collaboration to identify major cost savings for our project. As you all know, particle physics in the UK is facing a very serious financial problem (shortfall of £12M on a total of £100M for the experimental programme over the next 3 years) and we will all have to work hard to find a means for survival of our projects through this period. Within the RAL group, we have discussed the problem and have some suggestions. We now need to broaden the discussion to the full collaboration and reach a consensus. If you would like to discuss ideas with me before the meeting, please contact me at any time. I should add that the Science Committee is very keen not to damage prospects for UK participation in major future projects. Since LCFI is in this category, we have a reasonable chance that a carefully thought through plan, which honestly presents the minimal level to keep the project alive, will be supported by the Science Committee. Our response to SCP4 is required by 10th January. Since I will be in the USA from 4th January, we will need to finalise the document by the 3rd. 2) Detector R&D status reports 2.1 Thin ladder development 2.2 Drive control module 2.3 ADC system (from ESD group) 2.4 CCD58 testing 2.5 CPCCD (work with MTech) 2.6 CPCCD (simulation) 2.7 Readout chip 2.8 CPCCD MCM (multi-chip module, incl bump bonding) 2.9 CPCCD driver/motherboard and other electronics 2.10 Detector test system - Liverpool 3) Physics studies 4) LCFI organisation/manpower 5) Finances (current FY) 6) Funding for future FYs We will review the response from the 3rd December meeting of the PPRP, and the current situation which is enmeshed with the Science Committee and the abovementioned SCP4. 7) Reports from recent LC-related meetings 8) Future LC-related meetings 9) AOB If you have transparencies or drawings to show, please send them electronically to Tim Greenshaw, green@hep.ph.liv.ac.uk, so he can make them accessible from the LCFI home page.