LHCb Velo - Module - 93

Module      Hybrid     
Circuit      Pitch Adaptors               Chips             Sensor       
42
R-glued
93
r-93           All , R1                All , 0 , 1 , 2 , 3     2440-14E     
        R2                  4 ,   5 ,   6 ,   7
        R3                  8 ,   9 , 10 , 11
        R4                12 , 13 , 14 , 15
p-93           All , P1                All , 0 , 1 , 2 , 3     2439-05B     
        P2                  4 ,   5 ,   6 ,   7
        P3                  8 ,   9 , 10 , 11
        P4                12 , 13 , 14 , 15

Go to

Current Hybrid Log Entry

Module-93 Logfile - STAGE 1  Entered by phil at 04:27:11 PM 19/06/06
-----------------

 Module 93 entry added to data base. Associated with Substrate 67

 Thickness Max 0.000   Min 0.000

 Deviations A -0.103 / B 0.012 / C -0.171

 r-side Hybrid circuit added.
 p-side Hybrid circuit added.
 Substrate link to module updated.

Visual Inspection Comment:
--------------------------

 

========================================================================

Module-93 Logfile - STAGE 2  Entered by rcarroll at 09:53:23 AM 20/06/06
--------------------------

Thickness measurements at chip locations
----------------------------------------

	Thickness at chip pos 00 is     1.52
	Thickness at chip pos 01 is     1.51
	Thickness at chip pos 02 is     1.51
	Thickness at chip pos 03 is     1.50
	Thickness at chip pos 04 is     1.50
	Thickness at chip pos 05 is     1.50
	Thickness at chip pos 06 is     1.49
	Thickness at chip pos 07 is     1.49
	Thickness at chip pos 08 is     1.48
	Thickness at chip pos 09 is     1.49
	Thickness at chip pos 10 is     1.47
	Thickness at chip pos 11 is     1.48
	Thickness at chip pos 12 is     1.47
	Thickness at chip pos 13 is     1.46
	Thickness at chip pos 14 is     1.48
	Thickness at chip pos 15 is     1.46

	Average of thickness measurements at chip locations 1.488125

Thickness Measurement Comment:
------------------------------




========================================================================

Module-93 Logfile - STAGE 3  Entered by rcarroll at 04:37:07 PM 20/06/06
--------------------------

Phi and R side Metrology data:
-----------------------------

On arrival.

 4th corner deviation -0.381

M93_p_height.CSV uploaded. Longitudinal Analysis 
M93_r_height.CSV uploaded. Longitudinal Analysis 
M93_r_twist.CSV uploaded. Height Analysis 
========================================================================

Module-93 Logfile - STAGE 4   Entered by smithy at 05:11:46 PM 21/06/06
--------------------------


Module 93 sent for population updated to Stage 4 


========================================================================

Module-93 Logfile - STAGE 5    Entered by smithy at 12:28:09 PM 29/06/06
--------------------------

Received after polpulation:


========================================================================

Module-93 Logfile - STAGE 5    Entered by geoff at 02:54:07 PM 3/07/06
--------------------------

Comments for hybrid cicuit electrical tests:

 Module tested for electrical shorts - non found.

 Electrical test of components PASSED 


========================================================================

Module-93 Logfile - STAGE 6    Entered by geoff at 05:11:14 PM 3/07/06
--------------------------

Comments from visual inspection after population:

 R side:-
Chip 5, Solder on Vdd pad.
Chip 7, Solder on Vss pad.
Chip D, Solder on Vdd & Vss pads.
Phi side:-
Chip B, Solder on Vdd pad.


========================================================================

Module-93 Logfile - STAGE 7    Entered by rcarroll at 09:49:39 AM 4/07/06
--------------------------

Phi and R side Metrology data:
-----------------------------

After population.

 4th corner deviation -0.460

M93_p_height2.CSV uploaded. Longitudinal Analysis 
M93_r_height2.CSV uploaded. Longitudinal Analysis 
M93_r_twist2.CSV uploaded. Height Analysis 
========================================================================

 Authorisation  -    Entered by smithy at 10:54:09 AM 5/07/06
 -------------


 Authorisation given to proceed with PA and chip gluing

 Module has been set as PASS


========================================================================

Module-93 Logfile - STAGE 8   Entered by affolder at 01:11:00 PM 10/07/06
--------------------------

Following R-type Pitch Adaptors glued
----------------------------------------

PA-133-R1
PA-136-R2
PA-133-R3
PA-136-R4
========================================================================

Module-93 Logfile - STAGE 9   Entered by mpw at 03:12:55 PM 13/07/06
--------------------------

Following P-type Pitch Adaptors glued
----------------------------------------

PA-136-P1
PA-109-P2
PA-95-P3
PA-97-P4
========================================================================

Module-93 Logfile - STAGE 10    Entered by mpw at 03:18:10 PM 13/07/06
---------------------------

Place R-side chips

Chip   C1R3 position  0 on hybrid R-93 updated
Chip  C-1R3 position  1 on hybrid R-93 updated
Chip  C-3R4 position  2 on hybrid R-93 updated
Chip  C-4R4 position  3 on hybrid R-93 updated
Chip  C-3R3 position  4 on hybrid R-93 updated
Chip  C-2R3 position  5 on hybrid R-93 updated
Chip   C4R4 position  6 on hybrid R-93 updated
Chip   C5R4 position  7 on hybrid R-93 updated
Chip   C6R4 position  8 on hybrid R-93 updated
Chip   C7R4 position  9 on hybrid R-93 updated
Chip   C8R4 position 10 on hybrid R-93 updated
Chip   C7R5 position 11 on hybrid R-93 updated
Chip   C6R5 position 12 on hybrid R-93 updated
Chip   C5R5 position 13 on hybrid R-93 updated
Chip   C4R5 position 14 on hybrid R-93 updated
Chip  C-4R6 position 15 on hybrid R-93 updated
========================================================================

Comment -    Entered by gdp at 09:45:56 AM 14/07/06
-------

 Phi side Chips have been transferred from H83 by hand and
progessed to next stage.

Hybrid manually progressed to next stage.


========================================================================

Module-83 Logfile - STAGE 11    Entered by mpw at 04:48:33 PM 13/07/06
---------------------------

Place P-side chips

Chip  C-3R5 position  0 on hybrid P-83 updated
Chip  C-1R5 position  1 on hybrid P-83 updated
Chip   C3R5 position  2 on hybrid P-83 updated
Chip  C-3R6 position  3 on hybrid P-83 updated
Chip  C-1R6 position  4 on hybrid P-83 updated
Chip   C0R6 position  5 on hybrid P-83 updated
Chip   C1R6 position  6 on hybrid P-83 updated
Chip   C2R6 position  7 on hybrid P-83 updated
Chip   C3R6 position  8 on hybrid P-83 updated
Chip   C5R6 position  9 on hybrid P-83 updated
Chip   C6R6 position 10 on hybrid P-83 updated
Chip   C7R6 position 11 on hybrid P-83 updated
Chip  C-1R7 position 12 on hybrid P-83 updated
Chip   C0R7 position 13 on hybrid P-83 updated
Chip   C2R7 position 14 on hybrid P-83 updated
Chip   C3R7 position 15 on hybrid P-83 updated
========================================================================

Module-93 Logfile - STAGE 12   Entered by jcw at 02:26:22 PM 20/07/06
--------------------------

Backend Bond r-side Comment:
----------------------------

Multiple attempts to bond 767, 815, 857.

Problems with following 12 bond wires:
__________________________________
 Bond | Chip | RefNum | Pin Name |
----------------------------------
    1    15      135    VddPre
    2    15      136    VddPre
  539     8      207    Vdda
  538     8      207    Vdda
  767     4      137    GndPre
  768     4      138    GndPre
  770     4      140    VddPre
  815     4      207    Vdda
  857     3      180    Reset
  278    12        5    GndPre
  277    12        1    GndPre
  766     4      136    VddPre

========================================================================

Module-93 Logfile - STAGE 13   Entered by jcw at 04:35:52 PM 20/07/06
--------------------------

Backend Bond p-side Comment:
----------------------------

Problems with following 4 bond wires:
__________________________________
 Bond | Chip | RefNum | Pin Name |
----------------------------------
 1005     1      207    Vdda
 1006     1      208    Icurrbuf
 1007     1      209    Isf
   51    15      206    VddaTx

========================================================================

Module-93 Logfile - STAGE 14   Entered by huse at 09:15:07 PM 25/07/06
--------------------------

Electrical Test Comment:
----------------------------

 

R Chips PASS
Phi Chips PASS

R chips           NOISE                   PEDESTAL   P chips             NOISE                 PEDESTAL
Chips   Average     RMS     Average     RMS  
0 0.704 0.047 128.2192.945
1 0.708 0.049 131.8302.402
2 0.718 0.014 127.7222.957
3 0.731 0.015 126.4202.419
4 0.721 0.016 127.5622.961
5 0.719 0.015 126.0731.615
6 0.740 0.015 126.3250.859
7 0.740 0.014 128.9541.890
8 0.748 0.017 132.8601.510
9 0.736 0.021 126.3293.605
10 0.744 0.074 132.5511.455
11 0.734 0.077 130.5212.518
12 0.711 0.074 131.0921.093
13 0.655 0.060 129.1211.112
14 0.598 0.013 129.1192.186
15 0.602 0.018 131.8101.293
     
Chips   Average     RMS     Average     RMS  
0 0.713 0.063 127.8952.213
1 0.724 0.089 129.0361.853
2 0.708 0.014 129.2772.674
3 0.714 0.015 128.9351.888
4 0.712 0.017 130.9241.812
5 0.710 0.017 128.6051.370
6 0.739 0.015 130.6792.513
7 0.752 0.015 130.0811.599
8 0.734 0.019 128.9672.221
9 0.727 0.019 128.5271.942
10 0.759 0.118 133.2580.870
11 0.775 0.145 129.8822.338
12 0.688 0.069 126.1031.133
13 0.652 0.047 128.7311.806
14 0.607 0.017 130.0641.383
15 0.607 0.016 128.6821.768
Module updated to Stage 16 ======================================================================== Module-93 Logfile - STAGE 17 ------------------- Front end bonding (chip to pitch adaptor) on 710 r-side 710 Row 1 Entered by jcw at 03:26:30 PM 9/08/06 ---------------- Bonding Stats: 512 OK / 0 redone / 0 FAIL r-side 710 Row 2 Entered by jcw at 03:29:39 PM 9/08/06 ---------------- Bonding Stats: 511 OK / 1 redone / 0 FAIL Row Wire chipID Pos Chan Status DB 2 15 3461 0 57 1 OK r-side 710 Row 3 Entered by jcw at 03:30:20 PM 9/08/06 ---------------- Bonding Stats: 512 OK / 0 redone / 0 FAIL r-side 710 Row 4 Entered by jcw at 02:58:45 PM 10/08/06 ---------------- Bonding Stats: 509 OK / 3 redone / 0 FAIL Row Wire chipID Pos Chan Status DB 4 21 3461 0 83 1 OK 4 143 3471 4 59 1 OK 4 322 3478 10 7 1 OK r-side Front end bond complete. Database updated. Module updated to Stage 17 complete ======================================================================== Module-93 Logfile - STAGE 18 ------------------- Front end bonding (chip to pitch adaptor) on 710 p-side 710 Row 1 Entered by jcw at 03:59:10 PM 11/08/06 ---------------- Bonding Stats: 512 OK / 0 redone / 0 FAIL p-side 710 Row 2 Entered by jcw at 03:59:10 PM 11/08/06 ---------------- Bonding Stats: 512 OK / 0 redone / 0 FAIL p-side 710 Row 3 Entered by jcw at 04:00:15 PM 11/08/06 ---------------- Bonding Stats: 511 OK / 1 redone / 0 FAIL Row Wire chipID Pos Chan Status DB 3 330 3504 10 38 1 OK p-side 710 Row 4 Entered by jcw at 02:13:00 PM 14/08/06 ---------------- Bonding Stats: 512 OK / 0 redone / 0 FAIL p-side Front end bond complete. Database updated. Module updated to Stage 18 complete ======================================================================== Module-93 Logfile - STAGE 18A Entered by huse at 03:44:59 PM 4/09/06 -------------------------- Electrical Test Comment: ---------------------------- R Chips PASS Phi Chips PASS
R chips           NOISE                   PEDESTAL   P chips             NOISE                 PEDESTAL
Chips   Average     RMS     Average     RMS  
0 0.760 0.020 128.2312.282
1 0.791 0.020 132.8492.559
2 0.808 0.021 127.8072.894
3 0.832 0.018 126.5502.456
4 0.804 0.014 127.5592.993
5 0.834 0.024 126.1121.587
6 0.824 0.019 126.3470.874
7 0.900 0.030 129.0241.895
8 0.825 0.014 133.0421.550
9 0.855 0.016 126.4523.598
10 0.828 0.027 132.5271.506
11 0.901 0.040 130.4192.524
12 0.771 0.074 131.3571.115
13 0.745 0.072 129.3071.097
14 0.671 0.008 129.3002.232
15 0.792 0.032 132.1011.352
     
Chips   Average     RMS     Average     RMS  
0 0.802 0.094 128.1452.186
1 0.882 0.136 129.6851.981
2 0.794 0.018 129.4182.632
3 0.875 0.016 129.1441.871
4 0.789 0.018 131.0931.810
5 0.827 0.020 128.7611.390
6 0.823 0.018 130.8072.491
7 0.931 0.027 130.3611.638
8 0.795 0.009 129.1252.229
9 0.828 0.020 128.6591.935
10 0.879 0.093 133.4730.864
11 0.989 0.101 130.1502.420
12 0.745 0.071 126.2541.127
13 0.730 0.055 128.9391.808
14 0.659 0.016 130.2861.398
15 0.768 0.022 128.7961.718
Module updated to Stage 18 ======================================================================== Authorisation - Entered by affolder at 04:00:52 PM 4/09/06 ------------- Authorisation given to proceed with sensor gluing Module has been set as PASS ======================================================================== Module-93 Logfile - STAGE 19 Entered by at 02:39:47 PM 5/09/06 -------------------------- Following r-type Sensor glued ------------------------------- 2440-14E attached to hybrid 93 - DB updated Add Sensor Comment: ------------------- ======================================================================== Module-93 Logfile - STAGE 20 Entered by at 02:40:38 PM 5/09/06 -------------------------- Following p-type Sensor glued ------------------------------- 2439-05B attached to hybrid 93 - DB updated Add Sensor Comment: ------------------- ======================================================================== Module-93 Logfile - STAGE 21 Entered by huse at 09:35:40 AM 6/09/06 ---------------------------- Sensor-sensor Metrology Comment: -------------------------------- Hyb93P.CSV uploaded. Hyb93R.CSV uploaded. Sensor alignment Module updated to Stage 21 ======================================================================== Comment - Entered by mwhitley at 04:38:32 PM 6/09/06 ------- When bonding the bias bonds on the Phi side I noticed that there is no glue under the pitch adaptor on P1 on each corner at the sensor end this will require infilling prior to sensor bonding. ======================================================================== Module-93 Logfile - STAGE 22 Entered by huse at 05:38:48 PM 6/09/06 ---------------------------- Bias bond & IV Comment: ----------------------- hyb93P_2439-05B_unbonded.txt uploaded.     Plot Graphic hyb93R_2440-14E_unbonded.txt uploaded.     Plot Graphic Module updated to Stage 22 ======================================================================== Module-93 Logfile - STAGE 23 ---------------------------- Sensor end bonding (sensor to pitch adaptor) on 710 r-side 710 Row 1 Entered by mpw at 02:01:53 PM 18/09/06 ------------------- Bonding Stats: 511 OK / 0 redone / 0 FAIL / 1 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 1 400 3481 12 63 -2 OK 1 359 3480 11 27 1 OK 1 503 3484 15 91 1 OK 1 506 3484 15 103 1 OK Last 3 rows added by hand. GDP 18/09/06 r-side 710 Row 2 Entered by mpw at 02:04:57 PM 18/09/06 ------------------- Bonding Stats: 510 OK / 2 redone / 0 FAIL / 0 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 2 1 3461 0 2 1 OK 2 257 3476 8 2 1 OK r-side 710 Row 3 Entered by mpw at 02:06:11 PM 18/09/06 ------------------- Bonding Stats: 506 OK / 4 redone / 0 FAIL / 2 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 3 161 3472 5 1 1 OK 3 235 3475 7 41 1 OK 3 236 3475 7 45 1 OK 3 306 3477 9 69 1 OK 3 326 3478 10 21 -2 OK 3 379 3480 11 105 -2 OK r-side 710 Row 4 Entered by mwhitley at 03:02:56 PM 19/09/06 ------------------- Bonding Stats: 506 OK / 4 redone / 0 FAIL / 2 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 4 5 3461 0 16 1 OK 4 21 3461 0 80 1 OK 4 69 3468 2 16 -2 OK 4 214 3474 6 84 1 OK 4 363 3480 11 40 -2 OK 4 508 3484 15 108 1 OK Sensor bond complete. Database updated. Module updated to Stage 23 ======================================================================== Module-93 Logfile - STAGE 24 ---------------------------- Sensor end bonding (sensor to pitch adaptor) on 710 p-side 710 Row 1 Entered by mwhitley at 03:04:28 PM 19/09/06 ------------------- Bonding Stats: 505 OK / 6 redone / 0 FAIL / 1 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 1 47 3490 1 59 1 OK 1 53 3490 1 83 1 OK 1 77 3494 2 51 1 OK 1 268 3501 8 47 -2 OK 1 436 3507 13 79 1 OK 1 510 3510 15 119 1 OK 1 511 3510 15 123 1 OK p-side 710 Row 2 Entered by mwhitley at 03:05:22 PM 19/09/06 ------------------- Bonding Stats: 507 OK / 3 redone / 0 FAIL / 2 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 2 53 3490 1 82 -2 OK 2 56 3490 1 94 1 OK 2 305 3503 9 66 1 OK 2 306 3503 9 70 1 OK 2 363 3505 11 42 -2 OK p-side 710 Row 3 Entered by mwhitley at 03:06:58 PM 19/09/06 ------------------- Bonding Stats: 501 OK / 8 redone / 0 FAIL / 3 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 3 169 3498 5 33 1 OK 3 180 3498 5 77 1 OK 3 207 3499 6 57 1 OK 3 242 3500 7 69 -2 OK 3 290 3503 9 5 1 OK 3 294 3503 9 21 1 OK 3 296 3503 9 29 1 OK 3 331 3504 10 41 -2 OK 3 367 3505 11 57 1 OK 3 368 3505 11 61 1 OK 3 421 3507 13 17 -2 OK p-side 710 Row 4 Entered by mwhitley at 03:10:05 PM 19/09/06 ------------------- Bonding Stats: 501 OK / 8 redone / 1 FAIL / 2 SKIP / 0 ERROR Row Wire chipID Pos Chan Status DB 4 144 3497 4 60 -2 OK 4 200 3499 6 28 1 OK 4 201 3499 6 32 1 OK 4 204 3499 6 44 -1 OK 4 207 3499 6 56 1 OK 4 212 3499 6 76 1 OK 4 215 3499 6 88 1 OK 4 221 3499 6 112 1 OK 4 222 3499 6 116 1 OK 4 242 3500 7 68 -2 OK 4 277 3501 8 80 1 OK Sensor bond complete. Database updated. Module updated to Stage 24 ======================================================================== Module-93 Logfile - STAGE 24 Entered by huse at 11:21:37 AM 22/09/06 -------------------------- Log IV Measurements: -------------------- IV measurements after sensor to pitch adaptor bonding hyb93P_2439-05B_bonded.txt uploaded.     Plot Graphic hyb93R_2440-14E_bonded.txt uploaded.     Plot Graphic IV measurements logged Authorisation - Entered by gcasse at 09:49:22 AM 26/09/06 ------------- Authorisation given to log Laser test data and glue hybrid to pedestal Module has been set as PASS ======================================================================== Module-93 Logfile - STAGE 25 Entered by gcasse at 04:10:31 PM 26/09/06 -------------------------- Full Module Test Comment: ---------------------------- The channel list on the R side should add 3 shorts: 1762-1764, 1752-1754, 1760-1762 (at least, we\'ll see with the burn-in test if there are more shorts); on the phi side, the channels from 127 to 143, labelled as bad, are actually fine.
R chips           NOISE                   PEDESTAL   P chips             NOISE                 PEDESTAL
Chips   Average     RMS     Average     RMS  
0 1.294 0.196 129.4672.349
1 1.321 0.116 133.7182.838
2 1.528 0.148 128.6712.793
3 1.382 0.112 123.5922.533
4 1.352 0.097 127.8132.838
5 1.578 0.120 126.2991.395
6 1.493 0.121 126.0400.992
7 1.542 0.140 128.5782.045
8 1.435 0.090 133.0361.713
9 1.545 0.125 126.6663.302
10 1.500 0.136 132.1981.727
11 1.417 0.101 129.8292.582
12 1.251 0.078 131.4121.137
13 1.385 0.161 129.3811.137
14 1.134 0.059 129.4312.282
15 1.256 0.091 131.8111.427
     
Chips   Average     RMS     Average     RMS  
0 0.958 0.052 128.2362.910
1 1.000 0.062 130.4042.140
2 1.099 0.056 129.5792.677
3 1.180 0.054 129.2961.891
4 1.133 0.068 131.0911.787
5 1.181 0.109 128.8151.363
6 1.166 0.061 130.7892.553
7 1.272 0.075 130.3661.573
8 1.129 0.063 129.2972.253
9 1.158 0.058 128.8531.933
10 1.100 0.057 133.3451.004
11 1.158 0.052 129.7711.907
12 1.086 0.124 126.4561.114
13 1.040 0.100 129.1261.784
14 0.911 0.046 130.3851.376
15 1.015 0.053 129.0281.769
R chips problem bondsP side problem bonds
StripchipchannelFEBSEBLflagLStrip
1755 0 91 0 0 -3 1755
1764 0 100 0 0 -3 1764
1936 2 16 0 -2 -1 1936
1223 7 56 0 0 -3 1223
781 9 13 0 0 -1 781
917 10 21 0 -2 -3 917
599 11 40 0 -2 -3 599
534 11 105 0 -2 -3 534
63 12 63 0 -2 -1 63
97 12 97 0 0 -3 97
109 12 109 0 0 -1 109
401 13 110 0 0 -2 401
400 13 111 0 0 -2 400
144 15 111 0 0 -1 144
StripchipchannelFEBSEBLflagLStrip
1908 1 82 0 -2 -1 1908
1666 4 60 0 -2 -1 1666
1598 5 33 0 1 -3 1598
1506 6 44 0 -1 0 1506
387 6 117 0 0 1 387
361 7 68 0 -2 -2 361
360 7 69 0 -2 -2 360
1333 8 47 0 -2 -1 1333
1166 10 41 0 -2 -1 1166
1081 11 42 0 -2 -1 1081
143 12 81 0 0 1 143
142 12 84 0 0 1 142
141 12 88 0 0 1 141
139 12 93 0 0 1 139
138 12 96 0 0 1 138
137 12 100 0 0 1 137
136 12 101 0 0 1 136
135 12 105 0 0 1 135
134 12 108 0 0 1 134
131 12 117 0 0 1 131
130 12 120 0 0 1 130
127 13 1 0 0 1 127
926 13 17 0 -2 -1 926
Total bad r bonds     14Total bad p bonds     23
R-side chip/channel 0 91 laser flag -3 set R-side chip/channel 0 100 laser flag -3 set P-side chip/channel 1 82 laser flag -1 set R-side chip/channel 2 16 laser flag -1 set P-side chip/channel 4 60 laser flag -1 set P-side chip/channel 5 33 laser flag -3 set P-side chip/channel 6 117 laser flag 1 set R-side chip/channel 7 56 laser flag -3 set P-side chip/channel 7 68 laser flag -2 set P-side chip/channel 7 69 laser flag -2 set P-side chip/channel 8 47 laser flag -1 set R-side chip/channel 9 13 laser flag -1 set R-side chip/channel 10 21 laser flag -3 set P-side chip/channel 10 41 laser flag -1 set R-side chip/channel 11 40 laser flag -3 set P-side chip/channel 11 42 laser flag -1 set R-side chip/channel 11 105 laser flag -3 set R-side chip/channel 12 63 laser flag -1 set P-side chip/channel 12 81 laser flag 1 set P-side chip/channel 12 84 laser flag 1 set P-side chip/channel 12 88 laser flag 1 set P-side chip/channel 12 93 laser flag 1 set P-side chip/channel 12 96 laser flag 1 set R-side chip/channel 12 97 laser flag -3 set P-side chip/channel 12 100 laser flag 1 set P-side chip/channel 12 101 laser flag 1 set P-side chip/channel 12 105 laser flag 1 set P-side chip/channel 12 108 laser flag 1 set R-side chip/channel 12 109 laser flag -1 set P-side chip/channel 12 117 laser flag 1 set P-side chip/channel 12 120 laser flag 1 set P-side chip/channel 13 1 laser flag 1 set P-side chip/channel 13 17 laser flag -1 set R-side chip/channel 13 110 laser flag -2 set R-side chip/channel 13 111 laser flag -2 set R-side chip/channel 15 111 laser flag -1 set Module updated to Stage 25 ======================================================================== Comment - Entered by jlc at 02:38:30 PM 24/10/06 ------- Thickness of hybrid cooling tongue 1) 0.896 2) 0.893 3) 0.890 4) 0.890 5) 0.889 6) 0.885 7) 0.868 8) 0.869 9) 0.866 ======================================================================== Module-93 Logfile - STAGE 26 Entered by at 05:43:17 PM 3/11/06 -------------------------- Attached to Pedestal 42 ------------------------------- hybrid 93 attached to pedestal 42 R-glued - DB updated Add Pedestal Comment: ------------------- ======================================================================== Module-93 Logfile - STAGE 27 Entered by jlc at 03:34:14 PM 10/11/06 -------------------------- Full Module Metrology: ---------------------- Phi_summary.txt uploaded. Phi_si-plane.txt uploaded. Phi_hyb-plane.txt uploaded. R_summary.txt uploaded. R_si-plane.txt uploaded. R_hyb-plane.txt uploaded. Top_summary.txt uploaded. Top_Phi.txt uploaded. Top_R.txt uploaded. Touch_summary.txt uploaded. Cooling_face.txt uploaded. Metrology Analysis Module updated to Stage 27 ======================================================================== Module-93 Logfile - STAGE 28 Entered by at 04:50:13 PM 10/11/06 -------------------------- Attach cables to module ------------------------------- Cable HT-64 attached to Module 93 r-side - DB updated Cable LT-64 attached to Module 93 r-side - DB updated Cable HT-65 attached to Module 93 p-side - DB updated Cable LT-65 attached to Module 93 p-side - DB updated ======================================================================== Module-93 Logfile - STAGE 29 Entered by jlc at 04:54:05 PM 10/11/06 -------------------------- Full Module Metrology after Cable attachment: --------------------------------------------- Top_summary.txt uploaded. Top_Phi.txt uploaded. Top_R.txt uploaded. Metrology Analysis Module updated to Stage 29 ======================================================================== Module-93 Logfile - STAGE 30 Entered by gdp at 03:51:49 PM 15/11/06 -------------------------- Burn-In Test Comment: ---------------------------- Tcenter was -19C and the average Tsilicon was -8.5C Bad channel lists verified. Many bad channels on R-side (35+3) Phi side has 10.

Burn-in Logfile

  Data   R timeP time
Noise 081106_1525 081106_1524
Noise 081106_1549 081106_1551
Raw R-side thermograph data.
module42-R-08112006_1547.img
Raw P-side thermograph data.
module42-Phi-08112006_1546.img

Module updated to Stage 30 ======================================================================== Module-93 Logfile - STAGE 31 Entered by jlc at 04:48:01 PM 15/11/06 -------------------------- Full Module Metrology after Burn-in: ------------------------------------ Top_summary.txt uploaded. Top_Phi.txt uploaded. Top_R.txt uploaded. Metrology Analysis Module updated to Stage 31 ======================================================================== Comment - Entered by hcroft at 12:51:47 PM 22/11/06 ------- Burnin temps: hybrid -16deg Sensors -9.8deg ======================================================================== Comment - Entered by gdp at 02:44:13 PM 22/11/06 ------- Repairs to problem channels (shorts,opens) were carried out on R-side and the following channels have been fixed: Chip Channel SWStrip 0 88 1752 0 90 1754 0 91 1755 0 96 1760 0 98 1762 1 64 1856 1 66 1858 3 2 1661 3 64 1599 3 66 1597 6 124 1283 6 126 1281 9 13 781 12 109 109 15 111 144 This leaves 21 dead + 2 problem channels on the R-side ======================================================================== Comment - Entered by affolder at 12:41:35 PM 23/11/06 ------- R-side prior to shipment Picture caption: R-side prior to shipment R-side prior to shipment ======================================================================== Comment - Entered by affolder at 12:42:22 PM 23/11/06 ------- Phi-side prior to shipment Picture caption: Phi-side prior to shipment Phi-side prior to shipment ======================================================================== Comment - Entered by affolder at 01:46:07 PM 23/11/06 ------- 01:45:40 PM 23/11/06 M42-checklist.doc Module progressed to stage 32. Now complete. ======================================================================== Comment - Entered by affolder at 01:46:56 PM 23/11/06 ------- 01:45:40 PM 23/11/06 M42-checklist.doc Module progressed to stage 32. Now complete. ======================================================================== Comment - Entered by affolder at 01:48:16 PM 23/11/06 ------- Hybrid manually regressed to previous stage. ======================================================================== Comment - Entered by affolder at 01:58:49 PM 23/11/06 ------- 01:58:33 PM 23/11/06 M42-checklist.doc M42_visual_inspection.pdf Module progressed to stage 32. Now complete. ========================================================================