LHCb Velo - Module 42 Data

Module     42 Export Document: M42-checklist.doc
Base 42Visual Inspection M42_visual_inspection.pdf
Paddle A120
Hybrid 93 R-glued
Pitch
Adaptors
ChipsSensor V_dep
Volts
Last
IV
HT
cable
LT
cable
R-side PAs    Chips 2440-14E 30 IV    HT-64   LT-64
P-side PAs    Chips 2439-05B 30 IV    HT-65   LT-65

Chip noise data

Bare Chip Front End Bond Sensor End Bond Burn-in Bad Strips
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
  Data   R time plotsP time plots
Noise Results
ise-noncool ise-noncool
Noise Results
221106_1103 221106_1107
Noise Results
081106_1525 081106_1524
Noise Results
081106_1549 081106_1551
Verified Lists

Pedestal Comments

Action:                        Comment:
ManufactureFoot Inspection -0.002mm  
MET1Before grinding  Pedestal Metrology
CommentMatched to Hybrid 93  
CommentHyb 93 is 890/2=445, 445+220 wire dia.= 665 target  
CommentTarget 665 - 492 Met1 = 173, Plus 2 extra= 175 to gring off  
MET2After grinding  Pedestal Metrology


Module Metrology

These text files are tab delimited and it should be possible to import them into Excel.

First Module Metrology:       Analyse Data       Sensor Alignment

Phi_summary.txt
Phi_si-plane.txt
Phi_hyb-plane.txt
R_summary.txt
R_si-plane.txt
R_hyb-plane.txt
Top_summary.txt
Top_Phi.txt
Top_R.txt
Touch_summary.txt
Cooling_face.txt
CERN Metrology:       Analyse Data

P_si-plane.txt
R_si-plane.txt

Second Module Metrology after Cable attachment:       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Final Module Metrology after Burn-in       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt