LHCb Velo - Module 26 Data

Module     26 - P-typeExport Document: M26-checklist.doc
                             M26-checklist-v2.doc
                             M26-checklist-v3.doc
Base 26Visual Inspection M26_visual_inspection.jpg
                           M26_visual_inspection_v3.jpg
Paddle A24
Hybrid 60 R-glued
Pitch
Adaptors
ChipsSensor V_dep
Volts
Last
IV
HT
cable
LT
cable
R-side PAs    Chips 2433-01D 100 IV    HT-28   LT-28
P-side PAs    Chips 2433-10A 90 IV    HT-19   LT-19

Chip noise data

Bare Chip Front End Bond Sensor End Bond Burn-in Bad Strips
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
  Data   R time plotsP time plots
Noise Results
170107_1206 170107_1208
Noise Results
090107_1620 201206_1008
Noise Results
201206_1011 290906_0952
Noise Results
290906_0953 290906_1004
Noise Results
290906_0955 290906_1024
Noise Results
290906_1002 290906_1100
Noise Results
290906_1012 290906_1150
Noise Results
290906_1021 280906_1640
Noise Results
290906_1105 280906_1646
Noise Results
290906_1147 280906_1652
Noise Results
190806_1113 190806_1119
Noise Results
190806_1204 190806_1125
Noise Results
180806_2347 190806_1158
Noise Results
None 180806_2343
Verified Lists

Pedestal Comments

Action:                        Comment:
ManufactureAll Holes  
CommentFoot Inspection 0.000mm  
MET1Before grinding  Pedestal Metrology
Commenthybrid 60 tongue 935/2=468, 468+220 wire dia.= 688 target  
CommentTarget 688 - 592 Met1 = 96, Plus 14 extra = 110 to gring off  
MET2After grinding  Pedestal Metrology


Module Metrology

These text files are tab delimited and it should be possible to import them into Excel.

First Module Metrology:       Analyse Data       Sensor Alignment

Phi_summary.txt
Phi_si-plane.txt
Phi_hyb-plane.txt
R_summary.txt
R_si-plane.txt
R_hyb-plane.txt
Top_summary.txt
Top_Phi.txt
Top_R.txt
Touch_summary.txt
Cooling_face.txt
CERN Metrology:       Analyse Data

P_si-plane.txt
R_si-plane.txt

Second Module Metrology after Cable attachment:       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Final Module Metrology after Burn-in       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Extra Module Metrology after Cable change       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Extra Module Metrology after Cable removal       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Extra Module Metrology after Extended Cable 09/01/07       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Extra Module Metrology after Extended Cable removal 10/01/07       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Extra Module Metrology after Un-Extended Cable Change 17/01/07       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt