LHCb Velo - Module 05 Data

Module     05  
Base 5 
Paddle A123
Hybrid 135 R-glued
Pitch
Adaptors
ChipsSensor V_dep
Volts
Last
IV
HT
cable
LT
cable
R-side PAs    Chips 2469-07E 30 IV    HT-88   LT-88
P-side PAs    Chips 2439-10B 30 IV    HT-91   LT-92

Chip noise data

Bare Chip Front End Bond Sensor End Bond Burn-in Bad Strips
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
Noise Results
Plots (eps/png)
R-side P-side
  Data   R time plotsP time plots
Noise Results
280207_1409 280207_1408
Verified Lists

Pedestal Comments

Action:                        Comment:
ManufactureFoot Inspection -0.002mm  
MET1ped 5 before grinding  Pedestal Metrology
CommentHyb135 is 935/2=468, 468+220 wire dia.= 688 target  
CommentTarget 688 - 539 Met1 = 149, Plus 1 extra= 150 to grind off  
MET2Ped 5 after grinding  Pedestal Metrology


Module Metrology

These text files are tab delimited and it should be possible to import them into Excel.

First Module Metrology:       Analyse Data       Sensor Alignment

Phi_summary.txt
Phi_si-plane.txt
Phi_hyb-plane.txt
R_summary.txt
R_si-plane.txt
R_hyb-plane.txt
Top_summary.txt
Top_Phi.txt
Top_R.txt
Touch_summary.txt
Cooling_face.txt
CERN Metrology:       Analyse Data

P_si-plane.txt
R_si-plane.txt

Second Module Metrology after Cable attachment:       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt

Final Module Metrology after Burn-in       Analyse Data

Top_summary.txt
Top_Phi.txt
Top_R.txt